£3,000,000
Byzak Ltd
Water Treatment Works
CPC Civils were successfully awarded the Top Hill Low contract in March 2014 and completed works in February 2015. The Top Hill Low Project was based on the Water Treatment Works, and involved the construction of a new nitrate reduction system and new raising main system discharging into the Humber Estuary.
Furthermore, CPC Civils installed 4 cast in situ wet wells, valve chambers which were integrated into the existing water treatment works system. 200 meters of 900mm diameter ductile iron pipework linked the new and old systems together and included the constructed a steel framed build (to house mechanical and engineering equipment used for the nitrate reduction works).