2024 © CPC Civils Ltd. All rights reserved.
Design by eSterling
£1.2m
May Gurney
Waterway Engineering
Working with May Gurney, works to replace three hundred meters of the harbour / river wall for Waveney District Council took place in early 2013 Fifteen meter long piles, in pairs were driven to level in front of the existing failed wall, these piles were then anchored using over 120 No 85mm diameter steel tie bars to a line of back piles.
Ask a question