CPC Civils were successfully awarded the Lower Don Valley Flood Defence Project contract in September 2015 and completed works in June 2016. Lower Don Valley was a flood defence scheme in the centre of Sheffield.

The scheme involved increasing the existing flood defence height to ensure protection for up to 1 in 100-year flooding. The project involved constructing 140m of reinforced concrete walls and footings, cladding works in accordance with planning permissions, and increasing the height of the 110-meter-long existing wall by 3 courses.

To ensure delivery of such a complicated project, liaison with all the stakeholders was essential and critical to the success of the scheme.

To ensure protection of the environment and local businesses CPC Civils installed 155m of temporary flood defences on Nursery Street using a Duo Block system. This not only ensured their protection, but minimised any disruption during the construction phase. Furthermore, all plant used on the project was fuelled with ‘Bio Oil’.

In line with the client’s core values, the core workforce employed to undertake the project were based in Sheffield.

Furthermore, a satellite office was set up in Sheffield to support the local work, we are proud to confirm that this has now become a permanent office for CPC Civils.

Works on Nursery Street

  • Erection of 155m of temporary flood defence wall along Nursery Street using Duo Blocks.
  • Taking down 140m of stone/existing brick and concrete infill wall to design formation.
  • Constructing additional concrete footings as necessary and potential works to the existing wall below formation.
  • The construction of approx. 140m of reinforced concrete wall to defence level which is to be founded on top of the existing wall.
  • Raising 110m of 327mm thick brick wall to defence level by removing the existing coping, raising the wall by 3 courses and installing the existing coping
  • Raising an existing concrete ramp to design defence level.
  • Construction of new footpath and making good the existing footpath as necessary.
  • Taking down to store and re-erecting 135m existing pedestrian fence.
  • Constructing three brick buttresses to the cellar riverside wall of a semi derelict building adjacent the river and increasing the cill height of the cellar’s riverside windows by constructing internal walls up to the design defence level.

Works on 400 Series Interventions

  • Taking down 300m of existing brick and stone wall to design formation.
  • Constructing additional concrete footings as necessary and works to the existing wall below formation.
  • The construction of approx. 160m of reinforced concrete wall to defence level which was founded on top of the existing wall.
  • Concrete gravity retaining walls.
  • The construction of approx.140m of 327mm thick brick wall on top of existing wall to defence level.
  • Construction of new footpath and making good the existing footpath as necessary.
  • Erection of new handrail in areas of low wall.
  • Raising 250m of existing land up to 700mm by the construction of a bund with a central impermeable clay core.
  • Raising the existing footpath to Five Wears Walk to the design defence level.

Client Testimonials

“We have formed not only fantastic working relationships but also lasting friendships. I would not hesitate in working with CPC Civils again, as they are without question the most helpful, skilful and friendly partner you could wish for, and I look forward to developing this already fruitful relationship further in the coming years.”

“Well done Wayne Barron, John Donnellan, Pat Concannon, Conall Cunningham and the CPC team. We had a phone call from Paul Dennison (Severn Trent Water), he and his colleagues are very complimentary of the work at Kingsholm. They praised the tidiness, the setup, the workforce attitude and the standard of workmanship completed at the site ”

“I could sit and write multiple examples where CPC and your team have, in my opinion, gone above and beyond what would normally be expected. I would however just like to say that this ongoing attitude, and excellent working relationship, has not only aided Centro in 2 current Metro extensions it has also given me huge confidence in the planning of 5 further Metro extensions. It’s also made my job very enjoyable”

“Interesting weekend replacing a 12m length of sewer that had collapsed underneath a railway line in Bloxwich. Within 48 hours the team were able to diagnose the problem and work up a design and complete the repair. Amazing collaboration between STW, Amey, CPC and Network Rail”

Carillion have been impressed by the high safety, quality and overall standards of your on-site Supervision, quality of workmanship and the ability to complete the works in line with the agreed programme.  It has been a pleasure working with the team from CPC Civils on the Lower Don Valley Flood Defence Project and we welcome working with them once more on future successful projects

“Just a quick note to say thanks for taking the time to show us round last Thursday – I was very impressed by the way that work at the site was being managed, so please pass my congratulations on to the CPC team”

“A big thank you to the CPC team regarding the Achilles Audit undertaken on site – keep up the good work!”

“First and foremost, thanks to CPC for all the help and advice over the past 12 months. To each and every tradesman, your engineer, steelworkers, shuttering team, stone masons etc, a big thank you. At the risk of embarrassing anyone, we found everyone polite and obliging”

“I would like to thank all those who have worked on this project, especially the men who have been on site every day. In the 8 months of the work we have been kept fully informed at all times of the progress and all those concerned with the work have gone out of their way to be courteous and helpful.”

“Thanks to the installation teams from JP Concrete and CPC Civils  for a safe and excellent quality installation, very good job.”

“I am pleased to tell you that I have been asked by the Project Board to express their appreciation for the way you and your subcontractors have undertaken the District Heating Main Extension contract to date. We appreciate the professional manner in which you have proceeded with the planning and construction of the project despite the uncertain caused by delays in funding approval and agreements with landowners. The Board consider that your working methods, attention to detail, project management and health & saftey are excellent.”

“I would like to take this opportunity to thank you for the wonderful opportunity that you provided my students with last week. The effort, time and organisation that went into planning the visit is much appreciated. The resources you have given us are superb and will allow the students to really develop their understanding of flood management in their local area.”