Kier / Canal & Rivers Trust
Waterway Engineering
CPC were called out to attend to a breach in the canal during Christmas 2020, the breach was stemmed by initially dropping 1 tonne bags into the breach location whist at the sae time installing a temporary road way to the site. The temporary repair was improved by placing 200t of rock armour and clay whilst a pontoon and piling equipment could be mobilised. Sheet piles were then placed across the canal either side of the leak to allow a permanent repair to be affected. The perm works are expected to take pace through 2021.