Woodhouses, Yoxall

Project Value

£1m

Client Name

Amey

Project Type

Civil Engineering

CPC have been working on and around water since the mid Nineties and as such have gained a vastly experienced workforce.

Woodhouses is located just outside the village of Yoxall. A section 101a application was made for a new public foul water sewer for the village in May 2013. The scheme is looking to provide a FWS to serve the village with two pumping stations.

All properties in the area are currently served by private septic tanks and soakaways which are unable to function effectively due to high water table and clay geology. During times of heavy rainfall sewage effluent from the septic tanks is unable to drain away properly.

The new sewerage system will connect into the existing system at the bottom of Town Hill which drains to Bond End TPS before being pumped to the sewerage treatment works in Yoxall.

The recommended solution includes:

  • Construction of 1695m of 150mm dia gravity sewer in the highway of Town Hill, Woodhouses.
  • Construction of lateral sewers to connect forty one properties to the new public sewer.
  • Construction of one new sewage pumping station, with template SPS equipment in private land. This will be a layby pumping station.
  • Construction of a new template sewage pumping station in private land, using area of wasteland and existing access.
  • Construction of two new 80-100mm dia rising mains in the highway of Town Hill, totalling 760m.

Project Benefits:

  • Will enable a total of forty one properties to connect onto the public sewerage system.
  • Will provide public sewerage connection to five duty properties and enable a further thirty six properties.
  • Pollution in the community will be eliminated by the installation of the new public FW sewer.

Client Testimonials

“We have formed not only fantastic working relationships but also lasting friendships. I would not hesitate in working with CPC Civils again, as they are without question the most helpful, skilful and friendly partner you could wish for, and I look forward to developing this already fruitful relationship further in the coming years.”

“Well done Wayne Barron, John Donnellan, Pat Concannon, Conall Cunningham and the CPC team. We had a phone call from Paul Dennison (Severn Trent Water), he and his colleagues are very complimentary of the work at Kingsholm. They praised the tidiness, the setup, the workforce attitude and the standard of workmanship completed at the site ”

“I could sit and write multiple examples where CPC and your team have, in my opinion, gone above and beyond what would normally be expected. I would however just like to say that this ongoing attitude, and excellent working relationship, has not only aided Centro in 2 current Metro extensions it has also given me huge confidence in the planning of 5 further Metro extensions. It’s also made my job very enjoyable”

“Interesting weekend replacing a 12m length of sewer that had collapsed underneath a railway line in Bloxwich. Within 48 hours the team were able to diagnose the problem and work up a design and complete the repair. Amazing collaboration between STW, Amey, CPC and Network Rail”

Carillion have been impressed by the high safety, quality and overall standards of your on-site Supervision, quality of workmanship and the ability to complete the works in line with the agreed programme.  It has been a pleasure working with the team from CPC Civils on the Lower Don Valley Flood Defence Project and we welcome working with them once more on future successful projects

“Just a quick note to say thanks for taking the time to show us round last Thursday – I was very impressed by the way that work at the site was being managed, so please pass my congratulations on to the CPC team”

“A big thank you to the CPC team regarding the Achilles Audit undertaken on site – keep up the good work!”

“First and foremost, thanks to CPC for all the help and advice over the past 12 months. To each and every tradesman, your engineer, steelworkers, shuttering team, stone masons etc, a big thank you. At the risk of embarrassing anyone, we found everyone polite and obliging”

“I would like to thank all those who have worked on this project, especially the men who have been on site every day. In the 8 months of the work we have been kept fully informed at all times of the progress and all those concerned with the work have gone out of their way to be courteous and helpful.”

“Thanks to the installation teams from JP Concrete and CPC Civils  for a safe and excellent quality installation, very good job.”

“I am pleased to tell you that I have been asked by the Project Board to express their appreciation for the way you and your subcontractors have undertaken the District Heating Main Extension contract to date. We appreciate the professional manner in which you have proceeded with the planning and construction of the project despite the uncertain caused by delays in funding approval and agreements with landowners. The Board consider that your working methods, attention to detail, project management and health & saftey are excellent.”

“I would like to take this opportunity to thank you for the wonderful opportunity that you provided my students with last week. The effort, time and organisation that went into planning the visit is much appreciated. The resources you have given us are superb and will allow the students to really develop their understanding of flood management in their local area.”

Ask a question